Manufacturing
CH1-V9S
1.Integral steel pipe welding the body + beam and corbel integrated design
2.Body /beams are stress relieved
3.Body/beam processing machine (full imported Taiwan pentahedron gantry processing center)
4.The body/beam (rail & rack surface) is processed twice on the machining center: (1) milling + drilling (2) chamfering + tapping + fine milling
5.The straightness tolerance of the guide rail/rack mounting surface after machining is ≤0.02mm (full length).
6.The flatness tolerance of the guide rail/rack mounting surface after processing is ≤0.02mm (full length).
7.Guide rail/rack installation, the parallelism of guide rail/rack installation is within 0.02mm (full length).
8.Processed parts (Z-axis bottom plate, slide plate, etc. after grinding and CNC one-time drilling and tapping processing).